words per minute

25

anshulco


00:00

Speed

During the last decade there has been a steep growth in the demand of electric power in India a phenomenal increase in the number of consumers of all categories, particularly in the agricultural and industrial sectors. The generation and transmission capacities have not kept pace, In general, with the load-demand necessitating the generators to be loaded to their maximum capacity have not kept pace, the generators to be loaded to their maximum capacity most of the time. Due to insufficient spinning reserves, any emergency outage of major generating unit of the tripping of a tie-line on fault leads to frequency sinking, over-loading and cascade tripping of generators. The low frequency condition is generally accom-panied by low voltage unless elaborate arrangements like field forcing, etc, are provided in the generators. This is further aggravated due to the lowering of transient stablity limits particularly where long transmission lines are involved. The system is likely to separate out at an undesirable, into two segments with large disproportionality in the the generation and load-demand. Frequent operation of the system at low frequency also results in cumulative damage to the generating units, particularly to the low pressure-stage baldes of steam turbines and in their ultimate mechanical breakdown.
words per minute
0
wpm
accuracy
0%
Text Practice - Time 370 - English

words per minute